LS Academy Building Update #11

The plastering (cement covering) of the brick walls inside and outside is finished.  The doors are finished.  Wiring was pulled through the building for lights and power outlets (a luxury in a school).  Next is the finishing of the floors with a paint and cement mix (like a fresco), painting of the walls inside and outside, and the pouring of a concrete apron around the building.

Throwing the plaster (cement) up on the wall.  I've tried it...much harder than it looks.

Throwing the plaster (cement) up on the wall. I’ve tried it…much harder than it looks.

Walls finished inside and outside

Walls finished inside and outside

Welding the doors to fit

Welding the doors to fit

Here’s a peek at the kids in the Nursery thru 2nd grade classes held now in the Lord’s Servants Home dining hall.

1st Grade

1st and 2nd Grade

Nursery class

Nursery class