Kitchen / Dining Hall Rapid Progress

The Kitchen and Dining Hall building is progressing rapidly and all are excited.  In the last few weeks it has progressed from footer trenches to being ready for the ring beam.  The ring beam is a concrete ring, reinforced with steel that bands the building and walls above the doors and windows, we would call it a “Header”.  The ring beam can be seen in the brick walls of the building in the background.

Framed in floor foundation of large rocks, small stones, and steel mesh.

Framed in floor foundation of large rocks, small stones, and steel mesh.

Floor foundation.

Floor foundation.

PVC for drains and power lines.

PVC for drains and power lines.

Concrete poured over the foundation, one wheel barrow load at a time.

Concrete poured over the foundation, one wheel barrow load at a time.

Floor pouring complete.

Floor pouring complete.

Raising the walls.

Raising the walls in the kitchen cooking end.

Walls with doors evident in the dining hall part.

Walls with doors evident in the dining hall part.

Walls are now ready for the ring beam.

Walls are now ready for the ring beam.

Old kitchen in the shadow of the new one.

The old kitchen in the shadow of the new one.

Trip for 15 to serve at the Kenyan and Ugandan Orphanages

Mission Servants has a large and ambitious trip about to commence to serve at the LSH home in Kenya and the SOH home in Uganda.  15 members will leave the US in 3 teams from 3 different places and coordinate in Africa.  One team working exclusively at LSH, one exclusively at SOH, and one team working at LSH then traveling to SOH.  This is the 15th Mission Servant Ministry trip and a complicated one so we are requesting constant prayer for safety, logistics, and planning wisdom.  The first team leaves on January 17th, the 2nd and 3rd teams on the 22nd and 29th.

We have a number of plans besides connecting with and loving on the 106 children at the two homes, 87 kids at the Lord’s Servants Academy, almost 20 workers at all the facilities, and hundreds of people at 4 affiliated churches.  We are bringing almost 2,000 pounds of tools, books, sewing machines, Bibles, clothing, lighting components, balls, and goodies.  In Nairobi before driving to the LSH in western Kenya, tools and supplies to improve the homes will be purchased.

Our big projects include: Completing the living touches to the LSH Guest House (lighting, plumbing, cabinetry, curtains) which will allow longer term mission trips and missionary stays.  Installing lighting, curtains, and shelving in the new SOH Boys Dorm.  Launch the project for the new SOH Kitchen/Dining Hall/Utility building.  Numerous smaller projects to improve the facilities and lives of the kids will be done at all facilities.  Medical checking and eye exams will be provided.

It will be exciting.  Please look out for our blog and Facebook posts.  Thank you for your prayers and support!

Some of the Kids in their Christmas clothes at LSH

Some of the Kids in their Christmas clothes at LSH

Happy kids and their new dorm building at SOH

Happy kids and their new dorm building at SOH

 

 

SOH Uganda Update New Boys Dorm nearly finished

Lacking only some internal painting…the boys will be moving in very shortly.  (The outside painting is finished but not shown in these photos).  The rooms for six boys each has louvered glass windows, bug screens, and ceilings.  This will be Heaven on earth for the boys who may have been on the streets and have been staying in a rented warehouse until this time.  Praise God.

IMG_20141121_131546

IMG_20141121_115641 IMG_20141121_131456

Guest House at LSH Home

A very good problem has come up at The Lord’s Servants Home…..Many visitors wanting to serve the children and community.  A Kenyan law is also threatened to be enforced, further pressing this issue….visitors must sleep in a building separated from the children.  A single donor providing funds outside the operating budget and fundraising of Mission Servants helped us solve this challenge.

The old original, temporary (yet 40 year old) church structure was torn down and a Guest House constructed inside the LSH compound.  This building will allow more visitors to stay a longer period, even months.  It has 4 bedrooms, a kitchenette, great room, porch, indoor toilet, shower with hot water, a septic tank,and electricity.  It is very comfortable and can house up to 16 people.

In addition to a growing number of Mission Group trips (3 in 2014) several long term volunteers have spent as many as 4 months serving in the LS Academy, kids at LSH, and the nearby community.  We believe in God for this to continue as a blessing to the community and are thankful for the Guest House.

Pray about joining us on a trip!!!

100_4067

Front of the house with porch.

100_4071

Rear of the house with view of septic system (unfinished).

100_4048

Luxury #1. Sink and flooring next to be installed.

100_4050

Luxury #2. Shower stall. Sink and flooring to be next installed. Yes…it will have hot water.

Pushing Back the Darkness…SOH Uganda Update #4…New Boys Dorm

The 20 boys of Stream of Hope Home currently sleep in two rented rooms in the trading center along the road a little over a mile from the SOH property.  A 10 room structure with capacity for 30 boys, a caretaker family, an office, and a library is being pushed along so the boys can live with the rest of the children in safety and cut about 3 miles of walking per day from their schedule.  We plan for completion and move in by the end of November.  You can imagine how excited the boys are to have a permanent home.    The building was underway during our trip in August.  Current photos are below.

View from the back of the compound showing the Boys Dorm on the left with Girls House and other buildings to the right.

View from the back of the compound showing the Boys Dorm on the left with Girls House and other buildings to the right.

Cement covering inside and out as well as installation of windows and doors is next.

Cement covering inside and out as well as installation of windows and doors is next.

The inside is finished well and has a nice ceiling.

The inside is finished well and has a nice ceiling.

IMG_20141007_151914

A new latrine/bath house is being finished as well.

A new latrine/bath house is being finished as well.

The 2 doors on the left of the center building is where the boys sleep at night.  We want them at SOH ASAP!

The 2 doors on the left of the center building is where the boys sleep at night. We want them at SOH ASAP!